| Vault Coupling |
|
|
| Reduced Pressure Principle (RP) 3/4 in. through 2 in. Commercial |
|
|
| Reduced Pressure Principle (RP) 3/4 in. through 2 in. Tandem Above Ground |
|
|
| Reduced Pressure Principle (RP) 3/4 in. through 1-1/2 in. Lawn Irrigation |
|
|
| Reduced Pressure Principle (RP) 3 in. through 10 in. Above Ground |
|
|
| Offsets and Restraints |
|
|
| Fireline Connection 3 in. through 10 in. Above Ground |
|
|
| Fireline Connection 3 in. through 10 in. |
|
|
| Double Check Valve (DC) 3/4 in. through 2 in. Below Ground Traffic |
|
|
| Double Check Valve (DC) 3/4 in. through 2 in. Below Ground Non-Traffic |
|
|
| Double Check Valve (DC) 3/4 in. through 2 in. Above Ground |
|
|
| Double Check Valve (DC) 3 in. through 10 in. Below Ground Vault |
|
|
| Double Check Valve (DC) 3 in. through 10 in. Above Ground |
|
|
| Double Check Detector (DC) 3 in. through 10 in. Above Ground |
|
|
| Above Ground Enclosure 3/4 in. through 1 in. |
|
|
| Above Ground Enclosure 1-1/2 in. through 2 in. |
|
|